New in Platform

2026.01.21

2026.01.21

2026.01.21

January 2026

Design Studio

Minor text revision to clarify that the lead times in the BOM title represent the maximum expected lead times.

Bill of Materials

BOM: Lead Time changed to Maximum Lead Time

An intelligent electronics design platform that seamlessly automates component search, schematic generation, and EDA handover.

© Copyright 2026 CELUS · All rights reserved.